Project Name: |
2MW solar power plant |
Project Type: |
Solar Farm |
Installation Site: |
Singapore |
Installation Date: |
March 2019 |
My main goal was to provide green energy in a commercial business and to offset grid power consumption. The solar array I installed collects enough energy to power, and should help Mt. Shasta Animal Hospital save money month-to-month on their utilities.
Pulling the wire through the conduit was a bit more difficult than I expected it to be, but I managed. There was some heavy lifting involved, so I had a couple of guys assist me with carrying the panels onto the roof. I definitely appreciated having extra help.
How does it feel to complete a solar project?
Big! Indeed, everything went very smoothly and was better than expected. One of the goals of the project is the difficulty of supplying electricity through solar power and the huge expenditure of electricity, while protecting our natural environment, which will greatly affect the future of our country. Now, we drive through this highway. This is simply a sense of accomplishment!
Who else did you consider before choosing GooSun?
In preparing the project, we read some literature and checked several online retailers. Steven provided different product pre-configurations and detailed introductions, and had an in-depth understanding of our project. This fact triggered a conference call to discuss the products and systems we need in more detail. After the first call with Steven, there is no doubt that we hope to cooperate with Steven. We are always looking for competitive prices, technical expertise and help.